Jan 272008
 

We finally picked up two of the final bits of hardware for the master bathroom remodel: the towel rods and the paper holder. I also finally finished the four doors of the cabinetry and have moved on to finishing the drawer fronts. More cabinet pics. The weather turned wet and very cold, so I could no longer do the finishing in the garage – which turned out alright as the garage isn’t well suited for finishing anyway (it’s very dusty). Mary Lou has been very tolerant of me turning the master bedroom into my finishing booth – so long as I get the last coat of the day done early enough that she doesn’t have to inhale solvents all night long :-) I definitely learned a lesson in the experience – let SprayKote do the finishing. They’re equipped for it and they do great work – it just takes me too long to get an hour here and hour there so I can apply each of the six total coats required, not to mention the 5 sandings and various buffings in between! So the drawer fronts are finish sanded, cleaned, and have one side and the edges stained. I hope to be able to install the drawer faces by the end of next weekend – marking the completion of the master bath! More bath pics Wish me luck.

 Leave a Reply

(required)

(required)

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>